ANALYTICS

Aden’s Solar Paradox: A Green Revolution Still Fueled by Diesel

Aden Solar Power Station (Photo provided by the Electricity Corporation to South24 Center)

Last updated on: 03-11-2025 at 2 PM Aden Time

"Aden's solar plant stands as a monument to a clean energy future, yet it remains a prisoner to the diesel-dependent past it was meant to escape."


Ahmed Bahakim (South24 Center)


Aden’s long-running electricity crisis has evolved into one of the Middle East’s most revealing case studies in how infrastructure, politics, and planning failures can collide. The city lives with rolling blackouts that routinely surpass twenty hours a day. Public hospitals rely on emergency generators that are perpetually at risk of stalling. Water pumping stations cut in and out. Families structure their entire day around scattered moments of electricity --one hour at dawn, a few minutes before midnight. What should be a functioning metropolitan grid instead resembles an emergency lifeline stitched together day by day.


Yet, paradoxically, Aden is also home to one of the largest solar power facilities ever built in Yemen [1]. It is a modern, impressively engineered installation. It represents a sizable investment, years of planning, and a clear attempt to break free from the cycle of diesel dependency that has drained public budgets for decades. On paper, this facility should have marked the beginning of a new energy era, a foundation for stability in a city battered by conflict, economic collapse, and chronic power shortages.


But the transformation never came. Months after the solar plant began supplying the grid, Aden’s electricity situation looks eerily unchanged. In some neighborhoods, outages have even grown longer and more unpredictable. The new facility did not become the independent power source many hoped for. Instead, it was built in a way that binds it directly to the same fragile fuel-burning system it was supposed to replace.


This paradox is not the result of technology failing. The solar plant itself works. The panels produce electricity as expected. The inverters respond correctly. The engineering behind the physical array is solid. The failure lies not in the hardware but in the decisions that shaped the project decisions that ensured the facility would never be able to stand on its own.


This analysis examines how that happened: the planning gaps, the technical miscalculations, the policy oversights, and the administrative choices that undercut the project from its earliest stages. The story of Aden’s solar paradox reveals far more than a flawed power plant. It exposes systemic problems in infrastructure governance and policy execution at a time when Yemen needs long-term energy solutions, not symbolic gestures.



1. The Scale of the Crisis: A Grid on the Edge of Collapse


At the height of summer, Aden’s electricity demand peaks around 750 megawatts [2]. The city’s aging power stations, a mix of diesel and mazut generators, some decades old, struggle to produce even 500 megawatts on their best days. On most days, they fall well short of that mark.


This shortfall of roughly 250 megawatts is not just an energy gap. It is the central driver of social and economic paralysis in the city. The consequences ripple outward in immediate, tangible ways:


● Hospitals ration power, shutting off wards or operating without air-conditioning in extreme heat.


● Water systems falter, as pumping stations lose pressure and storage reservoirs empty unpredictably.


● Commercial activity slows, with shops, workshops, and small factories unable to operate consistently.


● Families burn through savings buying fuel for home generators that break down as often as they run.


● Public frustration rises, feeding political instability and undermining trust in local authorities.


The crisis revolves around one inescapable factor: fuel.


Nearly all of Aden’s generation capacity depends on steady shipments of diesel and mazut. When deliveries are delayed, underfunded, or disrupted-- a common occurrence -- the grid collapses almost immediately.


This dependence on fuel is ruinously expensive. In April and May of 2025, internal data indicated that the daily cost of keeping the old power plants running surpassed 1.8 million dollars per day. Most of this money was poured into acquiring enough diesel just to maintain a minimum baseline of electricity for frequency stability.


Yet despite this astronomical spending, power output often failed to exceed 100 megawatts after outages. In effect, the city was burning nearly two million dollars a day to stay in crisis.


Against this backdrop, the introduction of a new 120-megawatt solar project should have produced dramatic change. Instead, it exposed how deeply the grid’s weaknesses were embedded in its foundations.


2. A Modern Solar Plant Built with a Fatal Structural Omission


When the solar facility came online in mid-2024, its technical capabilities were significant. Spread across more than 1.6 million square meters and equipped with over 200,000 solar panels, the plant consistently produced around 95 megawatts at peak daylight.


That output is roughly equal to the combined power generated by Aden’s two major thermal plants, a remarkable achievement for a facility that burns no fuel and requires only routine maintenance.


But the entire first phase of the solar plant was designed and built without a grid-scale energy storage system [3]. 


The omission of battery storage is not a minor oversight. It is a fundamental flaw that undermines the entire purpose of modern solar infrastructure. Grid batteries do much more than store excess electricity for nighttime use. They perform several indispensable functions that allow renewable energy to stabilize rather than destabilize a national grid:


2.1 Frequency Regulation: Solar output fluctuates rapidly due to clouds, temperature changes, and irradiance variability. Batteries absorb or release energy instantly to keep the grid’s frequency stable.


2.2 Voltage Support: Sudden swings in solar production can cause voltage drops or surges. Without storage, these swings can destabilize or even shut down large parts of the grid.


2.3 Synthetic Inertia: Traditional generators provide inertia through the physical weight of their spinning turbines. Solar plants do not. Battery systems are programmed to simulate this inertia electronically, preventing dangerous frequency collapses.


These services form the backbone of grid stability. Without them, a large solar facility cannot operate independently. It must be anchored to conventional power stations that supply the missing inertia and frequency control.


This means Aden’s solar plant — despite its size — was structurally incapable of functioning unless the diesel generators were already online. The facility’s clean energy was welded into a grid that still had to burn fuel to stay alive.


3. The Consequences: Dependency Built into the Design


The design flaw became painfully clear during fuel shortages in early 2025. With more than 80 percent of fuel stations running dry, Aden’s thermal plants were barely operating. During daylight hours, the solar plant produced about 95 megawatts, a lifeline for the city.


But the moment the sun set, that power vanished completely. The grid had no battery storage to carry the excess into the night. Instead of extending relief into the evening, the system plunged millions of people back into full darkness.


Residents experienced the contradiction in the most visceral way:

A state-of-the-art solar facility was generating more power than any plant in the city, yet life still collapsed after sunset. The design had locked Aden’s solar future to its diesel-powered past.


4. A Damning Comparison: How a Smaller Solar Project Avoided These Mistakes


The failure to include storage becomes more striking when compared with another solar project of far smaller scale. The installation in Shabwa [4] , about half the size of Aden’s facility, was designed from the outset with integrated battery storage capable of providing steady nighttime supply and stabilizing the grid. The contrast raises crucial questions:


• Why did the smaller project receive the essential storage system while the larger, more critical project did not?


• Was the omission in Aden driven by cost-cutting, rushed timelines, political optics, or administrative oversight?


• How did stakeholders approve a multi-hundred-million-dollar project without ensuring its operational independence?


These questions go beyond technical analysis. They reflect deeper issues in governance, oversight, and long-term strategic planning, issues that repeatedly derail infrastructure development in conflict-affected regions [5]. 


5. How Technical Design Choices Cemented Fuel Dependency


The second major failure embedded in the project lies in the interconnection architecture of the solar facility. Engineers intimately familiar with the system confirm that the plant’s inverters cannot synchronize unless they detect a stable frequency already present on the grid. That stability can only come from diesel-powered generators.


If the thermal plants shut down, as they often do when fuel runs out, the solar facility cannot inject power. It must disconnect to avoid damaging equipment or sending destabilizing power surges through the system.


The result is a paradox bordering on absurdity:


• A plant producing nearly 100 megawatts of clean energy cannot operate unless the fossil-fuel stations are already running.


• This dependency was not imposed by physics. It was imposed by planning choices.


• A different design, one that included storage and modern grid-forming inverters, could have allowed the solar farm to function as a stable power source even when the rest of the grid went dark.


• Instead, the project was constructed in a configuration that enforces reliance on fuel.


6. The Policy Failure: Energy Governance Without a Strategic Vision


The story of Aden’s solar paradox is ultimately a governance problem. Modern energy systems are not built panel by panel or turbine by turbine. They are built through coherent policy frameworks that integrate generation, storage, transmission, and grid stability into one unified strategy. 


Aden’s solar project reflects the absence of such a strategy. Instead of being designed around long-term resilience, it appears shaped by short-term considerations:


• Rapid implementation to claim a symbolic infrastructure achievement.


• Budget constraints that cut out the most expensive (but essential) component: storage.


• Fragmentation of authority: with overlapping agencies, committees, and actors involved in approvals.


• Weak technical oversight: where critical engineering decisions were left without sufficient review.


• Lack of grid-modernization planning: preventing integration of renewable capacity into an aging, rigid, fuel-dependent system.


These conditions are typical in post-conflict settings, where infrastructure projects become political deliverables rather than strategic assets. But they come at a steep price. In Aden’s case, the price is a modern solar plant that cannot reduce reliance on diesel.


7. Missed Opportunities and Long-Term Implications


The consequences of these choices will reverberate for years:


7.1 Financial Drain: The city remains locked into spending millions of dollars per week on fuel, despite the presence of a major renewable asset.


7.2 Lost Public Trust: Residents expected a turning point; instead, they received a symbol of what better planning could have delivered.


7.3 Delayed Energy Transition: A project that should have been a catalyst for modernization instead reinforces outdated infrastructure.


7.4 Increased Vulnerability: Any disruption in fuel shipments, political, economic, or logistical, instantly collapses the grid, even on sunny days.


7.5 Greater Cost for Retrofitting: Adding storage after construction is far more expensive and technically complex than integrating it from the start.


8. What Aden Needs Now: A Path Toward Energy Independence


Fixing the system requires more than installing batteries. It demands a comprehensive realignment of energy policy, including:


• A second-phase storage system sized to at least one-third of daily solar production.


• Modern grid-forming inverters to allow renewable power to supply trusted baseload services.


• A clear energy governance structure to coordinate policy, planning, and procurement across institutions.


• Investment in transmission upgrades to handle variable renewable inputs.


• Transparent oversight mechanisms to ensure future infrastructure is designed to international standards.


These steps would not only unlock the full potential of the existing solar facility; they would lay the foundation for a long-term transition away from fuel dependency, a transition that is financially and environmentally unavoidable.


Conclusion: A Symbol of Both Potential and Failure


Aden’s solar paradox encapsulates the tension between aspiration and execution. The city has the technology, the infrastructure, and the promise of a new energy direction. But it also has a grid built on outdated assumptions, a planning process shaped by short-term pressures, and a governance environment that struggles to align ambition with capability.


The solar facility should have been a milestone on the path toward energy independence. Instead, it stands as a reminder that infrastructure is only as strong as the decisions behind it.


Aden’s future stability depends on correcting those decisions, not only for the sake of electricity, but for the lives, livelihoods, and institutions that depend on it.


Ing. Ahmed Salem Bahakim is an economist and energy researcher, working as Information Systems Specialist at the Public Electricity Corporation (PEC) in Aden. He has participated as a researcher in several papers related to renewable energy, power sectors, and energy efficiency in the EU region, as well as Yemen.

Ahmed holds a bachelor’s degree in Systems Engineering & Informatics form (Czechia) and a master’s degree MBA in Business Administration from (Germany).

[1] The Aden Solar Power facility is a 120-megawatt (MW) solar power plant located in the Al Buraiqeh district of Aden. The project was funded by the United Arab Emirates (UAE) and built by the UAE-based company Masdar. It was inaugurated on July 15, 2024.